PROJECT
|
Duration
|
Owner
|
Work Scope
|
PE/PP PROJECT
|
1989. 4. 25
- 1990. 5. 31
|
SKEC
|
- PIPING
DETAIL DESIGN
- TANKAGE AREA G/A DWG.
- FIELD SUPERVISION
- PRE-COMMISSIONING
- PIPE SUPPORT DETAIL DESIGN
|
120,000 DMTA C/A PLANT
|
1989. 4. 1
- 1989. 12. 31
|
DAEWOO ENG'G
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
|
VCM & PVC PROJECT IN
INDIA
|
1990. 4. 16
- 1990. 5. 30
|
LG ENG'G
|
- G/A DWG. CHECK
- ISOMETRIC DWG. CHECK
- B/M CHECK
|
250,000 MTA ETHYLENE PLANT
|
1990. 6. 1
- 1990. 7. 15
|
TMS ENG'G
|
- G/A DWG.
CHECK
- ISOMETRIC DWG. CHECK
- B/M CHECK
|
PVC E-5 EXPANSION PROJECT
|
1990. 8. 1
- 1991. 3. 31
|
LG ENG'G
|
- PLOT PLAN
- PIPING PLANNING
- G/A & DETAIL DWGS.
|
EPDM PROJECT
|
1990. 9. 1
- 1991. 5. 31
|
SKEC
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
|
JURONG CCR/AROMATICS PROJECT
|
1991. 6. 26
- 1991. 7. 15
|
DAELIM ENG'G
|
- PIPING
PLANNING
- BULK MATERIAL TAKE-OFF
- INFORMATION WORK
|
KUKDONG PETROCHEMICAL PLANT
|
1991. 8. 19
- 1991. 11. 30
|
POONG LIM INDUSTRIAL
|
- ISOMETRIC
DWG. CHECK
- SPOOL DWG.
- FIELD ENGINEERING WORK
- HYDRO PACKAGE
|
TOC PROJECT
|
1991. 3. 1
- 1993. 3. 31
|
DAELIM ENG'G
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
|
NO.4 CDU REVAMPING PROJECT
|
1994. 4. 1
- 1994. 5. 31
|
SKEC
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
|
TAC PROJECT
|
1994. 6. 1
- 1995. 6. 30
|
SKEC
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
|
HPC #2 PP PROJECT
|
1996. 6. 8
- 1998. 1. 30
|
HYUNDAI ENG'G
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
|
NO.4 AROMATICS PROJECT
|
2001. 10. 5
- 2002. 3. 31
|
SAZEN (IRAN)
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
|
KOLON MPP PROJECT
|
2002. 7. 25
- 2003. 4. 30
|
TOYO-KOREA
|
- PIPING
PLANNING
- G/A &
DETAIL DESIGN
- STRESS
ANALYSIS
|
BASF MDI PROJECT
|
2002. 10. 1
- 2003. 4. 30
|
HANHWA E&C
|
- PIPING
PLANNING
- G/A & DETAIL DWGS.
|
YRM PROJECT
(VISBREAKING)
|
2003. 4. 25
- 2002. 6. 30
|
TOYO-KOREA
|
- PIPING PLAN
DWG. CHECK
- PIPING ISO. DWG. CHECK
- SUPPORT
REVISION WORK
|
YRM PROJECT
(HYDROGEN)
|
2003. 9. 15
- 2003. 11. 15
|
TOYO-KOREA
|
- PIPING PLAN
DWG. CHECK
- PIPING ISO. DWG. CHECK
- STEAM
TRACING WORK
|
HPC 3 PE REVAMPING PROJECT
|
2003. 10. 21
- 2004. 2. 29
|
DAELIM INDUSTRIAL
|
- PIPING PLAN
DWG. CHECK
- PIPING ISO. DWG. CHECK
- FIELD
ENGINEERING
|
BASF IIP PROJECT
|
2003. 12. 13
- 2005. 3. 31
|
DAELIM INDUSTRIAL
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
- 3D PDS WORK
|
OCU PROJECT
|
2004. 11. 1
- 2005. 4. 30
|
TOYO-KOREA
|
- PIPING PLAN
DWG. CHECK
- PIPING ISO. DWG. CHECK
- TIE-IN DWGS.
|
IIP AUXILIARY FACILITES PROJECT
|
2005. 4. 20
- 2005. 7. 30
|
DAELIM INDUSTRIAL
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
- 3D PDS WORK
|
YNCC PROJECT
|
2005. 6. 21
- 2006. 7. 30
|
DAELIM INDUSTRIAL
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
- 3D PDS WORK
|
YEP-III PROJECT
|
2005. 12. 12
- 2006. 10. 30
|
DAELIM INDUSTRIAL
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
|
BTX REVAMPING PROJECT
|
2005. 8. 29
- 2006. 5. 30
|
DAELIM INDUSTRIAL
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
- TIE-IN DWG.
|
SAHARA PDH & PP PROJECT
|
2006. 2. 1
- 2007. 2. 28
|
DAELIM INDUSTRIAL
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
- 3D PDS WORK
|
NCP PP PROJECT
|
2008. 3. 1
- 2010. 7. 28
|
DAELIM INDUSTRIAL
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
- 3D PDS WORK
- FIELD
ENGINEERING
|
KAYAN HDPE PROJECT
|
2008. 10. 21
- 2009. 6. 30
|
DAELIM INDUSTRIAL
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
- 3D PDS WORK
|
M1 PROJECT
(GLYCERIN)
|
2009. 9. 10
- 2009. 11. 25
|
SEOUL MECH.
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
|
SADARA ISOCYANATES PMDI PROJECT
|
2011. 11. 17
- 2013. 11. 30
|
DAELIM INDUSTRIAL
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
- 3D PDS WORK
|
ELASTOMERS CARBON BLACK PROJECT
|
2012. 7. 17
- 2015. 4. 15
|
DAELIM INDUSTRIAL
|
- PIPING
PLANNING
- G/A & DETAIL DESIGN
- 3D SP3D WORK
- FIELD
ENGINEERING
|