÷Ʈ

 

 

 

 

PROJECT

ó

PLANT WATER EXPANSION FACILITIES IN ULSAN

1990. 3. 15
- 1990. 4. 15

SKǼ

- PIPING PLANNING
- G/A & DETAIL DESIGN

HENGSUNG 5 TH TANKAGE FACILITY

1991. 8. 13
- 1991. 10. 31

POONG LIM INDUSTR-IAL

- PIPING SHOP DWG.
- P &ID AND FIRE FIGHTING DWG.
- TANK & VESSEL SHOP DWG.
- MECH. ROOM ISO. DETAIL DWG

NEW 1 ROLLING PLANT WWT UNIT 500 OF KANGWON IND.

1991. 10. 4
- 1991. 11. 30

LEECHON ELECT.

- PIPING PLANNING
- MECH. DWG.
- G/A & DETAIL DESIGN
- FOUNDATION DWG.

SEOMJIN REGIONAL WATER SUPPLY PROJECT

1991. 10. 14
- 1991. 11. 8

LEECHON ELECT.

- PIPING DETAIL & SECTION
- ISOMETRIC DWG.
- SUPPORT DETAIL DWG.
- B/M TAKE-OFF

METROPOLITAN WATER SUPPLY PROJECT 4 TH STAGE

1991. 11. 10
- 1991. 11. 30

LEECHON ELECT.

- PIPING PLANNING
- G/A & DETAIL DESIGN

P & G
SSANGYOUNG
PAPER

1999. 5. 28
- 2000. 7. 31

SKǼ

- PIPING PLANNING
- G/A & DETAIL DESIGN

DONGBU STEEL
NO.2 RCM

2000. 7. 2
- 2000. 8. 5

YHENC

- G/A DWG.CHECK
- ISOMETRIC DWG.
- MATERIAL TAKE-OFF

ASG2000
PROJECT

2000. 10. 26
- 2000. 12. 20

KCC

- PROCESS ENGINEERING
- PIPING ENGINEERING
- INSTRUMENT ENGINEERING

GE
PROJECT

2001. 2. 5
- 2001. 3. 31

KHE

- PROCESS ENGINEERING
- PIPING ENGINEERING
- INSTRUMENT ENGINEERING

PINNACLE
PROJECT

2001. 10. 4
- 2001. 10. 25

KAWASAKI

- G/A & DETAIL DWG.
- SUPPORT MARKING & DETAIL DWG.
- STRESS ANALYSIS

KEYSPAN
PROJECT

2001. 10. 4
- 2001. 11. 30

KAWASAKI

- G/A & DETAIL DWG.
- SUPPORT MARKING & DETAIL DWG.
- BOILER DETAIL DWGS.

JK-2 A
PROJECT

2011. 7. 2
- 2011. 9. 30

ũ

- PIPING PLANNING
- G/A & DETAIL DESIGN